威力彩玩法

News
30 Aug 2019, 14:15
Benjamin Wehrmann

German government says new Rhine river engineering is adequate climate adaptation measure

威力彩玩法

New barrages and sluices in the Rhine are a possible solution to keep Germany's most important waterway working if recurring dry spells drain water levels 聽below the required minimum for shipping traffic, the German government has said. In a to a parliamentary inquiry by the pro-business party FDP, the government argues that river engineering solutions as "adaptation measures to climate change" are adequate for stable transport conditions on the Rhine and ensure companies and power plants in important industry regions aren鈥檛 cut off from raw material supplies.聽

Shipping on the Rhine, which links industrial centres from Switzerland to the Netherlands in one of Europe's economic core regions, encountered severe difficulties during the unusually dry and hot summer 2018. Companies that depend on the river have developed with the transport ministry that includes providing better information on weather and water levels, more storage capacity along the river, lighter ships that can navigate low water levels and optimisation of discharge options. Environmental groups have plans to carry out large-scale river engineering works on the Rhine, arguing that this could hurt the river's already strained ecosystems.

All texts created by the 威力彩玩法 are available under a . They can be copied, shared and made publicly accessible by users so long as they give appropriate credit, provide a link to the license, and indicate if changes were made.
« previous news next news »

Ask 威力彩玩法

S枚ren Amelang

Researching a story? Drop 威力彩玩法 a line or give us a call for background material and contacts.

Get support

+49 30 62858 497

Journalism for the energy transition

Get our Newsletter
Join our Network
Find an interviewee